Projects
Health Care
Westwood Mechanical has experience working in healthcare and wellness facilities in Manitoba & Ontario and have completed many renovations and new builds. We have completed extensive mechanical and medical gas installations to provide services to prep rooms & treatment areas, laboratories, diagnostic & MRI rooms, laundry, and personal care & rehabilitation facilities. We understand the importance of efficiently working in occupied spaces commonly utilized by staff, patients and the general public. Scheduling, timely information sharing and communicable substance containment are given highest consideration.
Grace Hospital Diagnostic Imaging Department Renovations
Renovation of the existing diagnostic imaging department on the main level and renovations to the ground level to relocate the medical records department. Construction was phased to accommodate the Owner’s continued occupancy of a portion of the diagnostic imaging department. Mechanical work included demolition of the mechanical room and install of new air handling units and pumps; providing services to the new scanner; install new heating and cooling coils and install of new DX heat/cool systems.
University of Manitoba Basic Medical Sciences Building Sanitary Drainage Replacement – Phase 2
Replacement of sanitary cast iron piping in the crawlspace with new acid waste piping and all traps, pumped sanitary, sump and venting piping. All removed piping was replaced with similar materials. The pneumatic sanitary lift station was replaced with a new electrically powered system with pump controls in the mechanical room. The lift station was connected to the emergency generator with downtime restrictions. All unused pneumatic tubing from the existing pneumatic sanitary lift station was removed. Two existing steam condensate recovery unit assemblies and CRU vented to the exterior.
St. Boniface Hospital “H” Block Boiler Control System Upgrade
Complete demolition of the existing control cabinets and associated space; repair, repaint, refloor and retore ceiling space after project work completed. All instrumentation was removed, replaced and reconnected to the existing infrastructure as per design. All shutdowns were coordinated with the Owners. Owner team received training at the completion of the project.
Ste. Anne Hospital MDR Sterilizer Installation
Installation of the MDR Sterilizer including the modification of the existing plumbing piping, installation of new venting for 5 steam safety relief valves and the installation of a blow down tank supplied by the Owner. As the hospital was a working unit, care had to be taken to complete the work during a scheduled shut down period. As well, care had to be taken to ensure the work area was kept a sterile environment.